Application of Markov process to pavement management systems at the network level
Butt, Abbas Ahmad
This item is only available for download by members of the University of Illinois community. Students, faculty, and staff at the U of I may log in with your NetID and password to view the item. If you are trying to access an Illinois-restricted dissertation or thesis, you can request a copy through your library's Inter-Library Loan office or purchase a copy directly from ProQuest.
Permalink
https://hdl.handle.net/2142/19521
Description
Title
Application of Markov process to pavement management systems at the network level
Author(s)
Butt, Abbas Ahmad
Issue Date
1991
Doctoral Committee Chair(s)
Carpenter, Samuel H.
Department of Study
Civil and Environmental Engineering
Discipline
Civil Engineering
Degree Granting Institution
University of Illinois at Urbana-Champaign
Degree Name
Ph.D.
Degree Level
Dissertation
Keyword(s)
Engineering, Civil
Language
eng
Abstract
A probabilistic network level pavement management system (PMS) has been developed based on the Markov process. The system uses PCI method for pavement condition rating. The pavement performance prediction model has been developed based on the Markov process. Homogeneous and non-homogeneous Markov chains have been used in the model development. The comparison of the results from the Markov prediction model and the constrained least squares model showed similar trends. Dynamic programming has been used to develop the optimal M & R recommendations for each pavement family/state combination. Two prioritization programs have been developed to allocate the constrained budget in an optimal way. The first prioritization program is based of weighted optimal benefit/cost ratios. The second prioritization program is based on the incremental benefit/cost ratio technique.
The implementation of the developed optimization methods on an existing airfield pavement network revealed that for a given constrained budget scenario: (1) Prioritization using incremental benefit/cost ratio results in a higher network PCI as compared to prioritization using optimal benefit/cost ratio. (2) The prioritization using the incremental benefit/cost ratio program utilizes the available constrained budget to the best of their full limit. (3) To maintain a specified network PCI, the incremental benefit/cost ratio program will spend more money as compared to the optimal benefit/cost ratio program.
Use this login method if you
don't
have an
@illinois.edu
email address.
(Oops, I do have one)
IDEALS migrated to a new platform on June 23, 2022. If you created
your account prior to this date, you will have to reset your password
using the forgot-password link below.