Withdraw
Loading…
Optimal Approach for Addressing Reinforcement Corrosion for Concrete Bridge Decks in Illinois—Phase II
Gombeda, Matthew; Lallas, Zoe; Rivera Jr, Estevan
Loading…
Permalink
https://hdl.handle.net/2142/117507
Description
- Title
- Optimal Approach for Addressing Reinforcement Corrosion for Concrete Bridge Decks in Illinois—Phase II
- Author(s)
- Gombeda, Matthew
- Lallas, Zoe
- Rivera Jr, Estevan
- Issue Date
- 2023-05
- Keyword(s)
- Reinforcement
- Reinforced Concrete
- Corrosion
- Bridge Decks
- Life-Cycle Analysis
- A1035 Reinforcement
- Abstract
- This report presents the expansion of a previously introduced life-cycle cost calculation framework for concrete bridge decks in Illinois. In addition to the alternative reinforcement options examined in the Illinois Center for Transportation and Illinois Department of Transportation project R27-SP49, two additional reinforcing bar types—stainless steel–clad carbon core and textured epoxy-coated bars—are the main subjects of this study. The results of a comprehensive literature review of these two additional bar options will highlight their cost-benefit characteristics toward optimizing the life span of a concrete bridge deck, most notably trade-offs between often increased upfront material costs and enhanced durability over a design 100-year service life. Additionally, the scope of this study includes the development of a more robust methodology to account for the effect of the relatively high nominal yield strength and corresponding reduced ductility of A1035 bars, one of the alternate reinforcement options examined in R27-SP49. The researchers used a numerical moment-curvature-based analysis methodology to facilitate the development of a design-friendly modified high-strength reinforcement factor that supersedes the nominal yield strength factor proposed in the original version of the life-cycle cost framework. The outcomes of this project and R27-SP49 will collectively expand upon and aim to enhance the effectiveness of the originally proposed life-cycle cost framework. The outcomes will be demonstrated by presenting updated life-cycle costs and via a parametric study of two hypothetical bridge deck examples, each falling into significantly different categories for traffic demands and select performance expectations.
- Publisher
- Illinois Center for Transportation/Illinois Department of Transportation
- Has Part
- https://doi.org/10.36501/0197-9191/23-005
- ISSN: 0197-9191
- Series/Report Name or Number
- FHWA-ICT-23-004
- Type of Resource
- text
- Language
- en
- Sponsor(s)/Grant Number(s)
- IDOT-R27-SP52
- Copyright and License Information
- No restrictions. This document is available through the National Technical Information Service, Springfield, VA 22161.
Owning Collections
Manage Files
Loading…
Edit Collection Membership
Loading…
Edit Metadata
Loading…
Edit Properties
Loading…
Embargoes
Loading…