Sponsor(s)/Grant Number(s)
- Published with the generous support of Elizabeth Rogers
- P01AG039347
- P30DA018310
- P.A. 83-1268
- Paritally supported by Generalitat Valenciana under grant PROME- TEOII/2015/013.
- Partially funded by IMLS National Leadership Grant LG-06-07-0020
- Partially supported by by NRL under contract number N00173-17-1-G002.
- Partially supported by NRL under contract N00173-17-1-G002.
- Partially supported by NSF grant CNS-131910
- Partially supported by NSF Grant CNS 13-19109.
- Partially supported by NSF Grant CNS 13-19109.
- Partially Supported by NSF Grant CNS 13-19109.
- Partially supported by NSF Grant CNS 14-09416, NRL under contract number N00173-17-1-G002, the EU (FEDER), Spanish MINECO project TIN2015-69175-C4-1-R and GV project PROMETEOII/2015/013. Raul Gutierrez was also supported by INCIBE program ``Ayudas para la excelencia de los equipos de investigacion avanzada en ciberseguridad''
- Partially supported by NSF Grants CNS 13-19109 and CNS 14-09416, and AFOSR Contract FA8750-11-2-0084.
- Partially supported by the EU (FEDER) and the Spanish MINECO under grants TIN 2015-69175-C4-1-R and TIN 2013-45732-C4-1-P
- Part of the Prestressed Concrete Reactor Vessel Program of the Oak Ridge National Laboratory, operated by Union Carbide Corp. for the U.S. Atomic Energy Commission. Subcontract no. 2906 under Contract no. W-7405-eng-26.
- Performed pursuant to contract no. 400-81-0030 of the National Institute of Education
- Performed pursuant to contract no. NIE 400-81-0030 of the National Institute of Education
- Performed pursuant to contract nos. HD05951 of the National Institute of Child Health and Human Development, 00840068 of the Department of Education, and 400-81-0030 of the National Institute of Health
- Performed pursuant to grants HD-05951, HD-06864, and HD-15808 from the National Institute of Child Health and Human Development and contract no. 400-81-0030 of the National Institute of Education.
- Picatinny Arsenal, Ordnance Corps, Department of the Army. Contract No. DA-11-022-ORD-401, Project No. TB4-721.
- Preparation of this manuscript and much of the research reported herein was supported by Grants HD 05951, HD 06864, and HD 00111 from the National Institute of Child Health and Human Development
- Prepared as part of an investigation conducted by the Engineering Experiment Station, University of Illinois, in cooperation with the State of Illinois, Division of Highways, and the U.S. Dept. of Transportation, Federal Highway Administration, Bureau of Public Roads; project IHR-94.
- Prepared for Illinois Department of Natural Resources, Division of Fisheries, Federal Aid Project F-196 R-6
- Prepared for Illinois Department of Natural Resources; W-112-R-18
- Prepared for Illinois Hazardous Waste Research and Information Center HWRIC Project 93-112
- Prepared for Indiana/Gray Bat Recovery Team Meeting, Columbia, Missouri, March 5-6, 1991
- Prepared for the Hazardous Waste Research and Information Center, Illinois Department of Energy and Natural Resources. HWRIC Project 88-042.
- Prepared for United States Environmental Protection Agency, Waste Reduction Innovative Technology Evaluation (WRITE) Contract No. CR15829
- Prepared for United States Environmental Protection Agency Waste Reduction Innovative Technology Evaluation (WRITE), Contract No. CR-815829
- Prepared under contract· SRA-251 for Sorensen Company Paxton, Dlinois
- Previous related project: U.S. Department of Energy (DE-FE-0032018)
- Princeton/MARCO / 2009-DT-2049
- Project 1080
- Project 1080, Task 10803
- Project F-101-R-16-20
- Project funded by U.S. DOE 10/1/2015-9/30/2018.
- Project funding was provided by a research grant from the Department of Natural Resources, contract no. HWR01171. XPS analysis was carried out in the Center for Microanalysis of Materials, University of Illinois, which is partially supported by the U.S. Department of Energy under grant DEFG02-91-ER45439.
- Project IHR-10
- Project IHR-10 , Illinois Cooperative Highway Research Program
- Project IHR-10 Investigation of Prestressed Concrete for Highway Bridges
- Project IHR-301
- Project IHR-303
- project IHR-5; Illinois Cooperative Highway Research Program Phase I
- Project IHR-64
- Project IHR-64 , Illinois Cooperative Highway Research Program
- Project IHR-85
- Project IHR-93 , Illinois Cooperative Highway Research Program
- Project IHR-93; Illinois Cooperative Highway Research Program
- project IHR-93; illinois Cooperative Highway Research Program Phase I